We travel the northeast and beyond.
Projects
|
TANK MANUFACTURED
READY TO SHIP
|
AIR PREHEATER AIRCRAFT
ENGINE TEST STAND
|
|
HYDRAULIC AND PUMP
REPAIR OF GRAPPLE
|
NEW STACK INSTALLATION
IN NEW JERSEY
|
![]() |
|
|
56" VALVE REMOVED,
REPAIRED AT SHOP,
REINSTALLED ON NAVAL SHIP
|
ON SITE AVK ELECTRONIC
SAFETY VALVE TESTING
WHILE PLANT IS OPERATIONAL
|
|
BLOWDOWN COVER
MANUFACTURED FOR O.E.M. VALVE
|
MANIFOLD REPAIRS FOR NAVY SHIP
|
|
DRYDOCK SHIP VALVE REPAIRS |

